Most people only see two moments of a custom home build: the empty lot, and the finished photos. Everything in between, usually six to twelve months of work, is where the actual construction takes place.

1. Foundation. Poured first, and it has to cure before anything else happens. Rough plumbing gets set underneath it too, so pipe locations for future bathrooms and kitchens are planned before the concrete goes in.

2. Framing. Walls, floor systems, and roof trusses go up, and the layout becomes visible for the first time. Window and door openings get set here as well.

3. Weatherproofing. The house gets wrapped: sheathing, house wrap, windows, and exterior doors. This protects the framing while the rest of the build continues, and it is usually when the roof goes on.

4. Rough In. Plumbing, electrical, and HVAC all get run before any walls close up, each one typically requiring its own inspection.

5. Insulation and Drywall. This is the stage where a house starts to feel like real rooms rather than a wood frame.

6. Finish Work. Flooring, trim, cabinetry, countertops, and fixtures go in, roughly in that order.

7. Final Walkthrough. A punch list of small remaining items gets addressed before move in.

If you are planning a custom build and want to understand what the timeline would look like for your project, get in touch with our team.